Automatic calculation of indicators as a decision support technique in the National Health System
Lugo GJA, Torres LS, García PAM, Piñero PPY, Delgado VR
Language: Spanish
References: 18
Page: 472-481
PDF size: 754.13 Kb.
ABSTRACT
The control and monitoring of projects through management indicators is a fundamental practice as decision support technique. However, the time taken to obtain these indicators in projects of the National Healthcare System is high because the originating data are scattered, poorly structured and are subjectively and manually collected, causing delays in corrective and preventive actions. The aim of the paper is to show an automation process for the calculation of management indicators in an organization integrated into an informatics tool of project management, with potential applications by the National Healthcare System in the control and monitoring of their projects. The application of the proposal in the National Healthcare System could be valuable as decision support technique during the surveillance and guidance of sector goals.
REFERENCES
Blanco LJ. La informática en la dirección de empresas. La Habana: Ed. Félix Varela; 2011.
Partido Comunista de Cuba (PCC). Lineamientos de la Política Económica y Social del Partido y la Revolución. La Habana: Ed. PCC; 2011.
Pressman RS. Ingeniería de Software: un enfoque práctico. Ciudad de México: McGraw-Hill; 2002.
Institute of Electrical and Electronics Engineers. EE.UU.: IEEE.Software Engineering Standards; 2004.
Chrissis MB. CMMI Guidelines for Process Integration and Product Improvement. Boston: Ed. Addison-Wesley; 2003.
White T. Hadoop: The definitive guide. California: O'Reilly Media; 2012.
Delgado R. La Dirección Integrada de Proyectos haciendo uso de las Nuevas Tecnologías de la Informática y las Comunicaciones. La Habana: Ed. CETA ISPJAE; 2003.
Project Management Institute. Project Management Body of Knowledge (PMBOK) 2008. Pennsylvania (EE.UU.): PMI Publications; 2009.
PRINCE 2. Managing Successful Projects with Prince 2. London: Ed. TSO; 2009.
ANSI/ISO/ASQ. Q10006: Quality Management systems-Guidelines for quality management in projects. Ontario (Canada): International Organization for Standardization (ISO); 2003.
The Standish Group. Boston: CHAOS Report; 2010.
André M, Baldoquín MG, Acuña ST. Formal model for assigning human resources to teams in software projects. Information and Software Technology. 2011;53(3):259-75.
Pacelli L. The Project Management: 18 Major Project Screw-Ups, and How to Cut Them Off at the Pass. New Jersey: Ed. Prentice Hall; 2004.
Lugo JA, García AM, Delgado R. Gestión de indicadores en proyectos de software. Perspectivas actuales y futuras. Rev Cubana Cienc Inform. 2009;3(3-4):19-25.
Lugo JA, García AM. Colección automática de métricas hacia un repositorio de mediciones. Rev Fac Ingen Univ Antioq. 2011;58:199-207.
Piñero PY. GESPRO. Paquete para la gestión de proyectos. Rev Nueva Empr. 2013;9(1):45-53.
Software Engineering Institute. CMMI for Dev. v1.3. Pittsburgh: Ed. Carnegie Mellon University; 2010.
Lugo JA. Modelo para el control de la ejecución de proyectos basado en indicadores y lógica borrosa. Tesis de maestría. Laboratorio de Investigaciones en Gestión de Proyectos, Universidad de las Ciencias Informáticas, La Habana; 2012.